Power Industry

Full list of references download

Selection of international references

  • Concept for modernisation of the equipment for coal and biomass transport to coal bunkers at Power Plant B.
  • Documentation of the installation for unloading the powdered limestone at Ostrołęka Power Plant, commissioned by the company RAFAKO.
  • Applications for: integrated permit IPPC for the gas-steam unit as well as permit for participation in the EU Greenhouse Gases Emissions Trading System for the gas-steam unit.
  • Preparing and running the tender procedure for conversion of OP-140 boiler into a fluidised bed boiler fired with biomass.
  • Comprehensive technical documentation for implementation of the following project "Construction of the gas reception equipment and installations for natural gas transport from the intake point indicated by the gas supplier to the re-built boiler OP-140".
  • Development of the financial model for the years 2011—2027 and update of the presentation for proposed variants.
  • Concept for flue gas discharge from the fluidised bed boiler fired with biomass (Green Power Unit).
  • Design documentation for the installation of fly ash transport from retention tanks of the loading station as well as as-built documentation for construction of the central compressor station.
  • Concept for flue gas discharge from the fluidised bed boiler fired with biomass (Green Power Unit) via flue gas ducts assigned to unit no 8 to FGD absorber D.
  • Technological-engineering evaluation for the floor structure with a structure of posts and chairs supporting the floor in axes F—G as well as 19—22 and 27—30 at units nos 5 and 7.
  • Concept for the method of feed water preheating at the Green Power Unit for needs of catalyst burn-in.
  • Concept for technical solutions in all the branches for the module dust removal installations: buffer silo, selected transfer points of the biomass belt conveyors, coal handling system and by-boiler bunkers of the coal handling system for power units nos 1—7.
  • Detailed designs connected with installation of the biomass-fired boiler and electrostatic precipitator with auxiliary installations and facilities at GDF Suez, commissioned by Foster Wheeler Energia.
  • Developing the design of relocations for the existing pipelines and equipment of the ash loading station, colliding with the new ESP at GDF Suez, commissioned by Foster Wheeler Energia.
  • Documentation of secondary circuits of units nos 7 and 8 connected with modernisation of the equipment of forebay of units nos 7 and 8 at Połaniec Power Plant, commissioned by "Energoprojekt-Kraków" SA. 
  • Holding the function of the Technical Advisor in the process of selecting a contractor for the power unit of capacity of approximately 1,000 MW.
  • Assessment of the explosion risk for facilities and areas adjacent to Kozienice Power Plant in line with the binding fire fighting regulations.
  • Preparing the documents of the work positions protection from an explosion of facilities at Kozienice Power Plant and assessment of the risk of explosive atmosphere arising at work positions.
  • Concept for modernisation of the rain-industrial effluents treatment plant as well as effluents pumping station at Kozienice Power Plant due to the planned construction of a new power unit of capacity of 1,000 MWe.
  • Comprehensive design documentation (basic and civil engineering design) for the following project "Development of the civil engineering design for the power unit of 1,000 MWe" at Kozienice Power Plant, commissioned by "Energoprojekt-Warszawa" SA.
  • Consulting services for the unit 900 MW, commissioned by Alstom Power Stuttgart.
  • Development of data for the biomass feeding installation in order for the ordering party to prepare the bid for the biomass feeding installation for boilers of units nos 5—8 with omission of coal pulverisers at Rybnik Power Plant, commissioned by Doosan Babcock.
  • Concept for modernisation of the compressed air installation.
  • Service of the Freelance 2000 system for the water treatment plant.
  • Detailed design for drainage of the furnace waste storage yard with surrounding trenches to the culvert under S-7 road.
  • Modernisation of the cooling water pumping station and switchgear as well as as-built documentation for the electrical part of primary and secondary circuits at Kraków Combined Heat and Power Plant, commissioned by Elektrobudowa.
  • As-built technical documentation with regard to the installations for biomass transport, storage and processing at Kraków Combined Heat and Power Plant, commissioned by Elektrobudowa.
  • Equipotentialisation for generator zones of the turbine hall at unit no 4 at Kraków Combined Heat and Power Plant — the detailed and as-built design, commissioned by Elektrobudowa.
  • Search for potential locations, Acquisition and specification of data inclusive of sources with regard to 20 locations where the construction of a nuclear power plant would be feasible.
  • Conversion of units nos 3 and 4 — supplementary analyses, update of the economic model and analyses with regard to the biomass co-combustion at two units out of units nos 5—8.
  • Expert's opinions and diagnostic examination enabling an assessment of the technical condition of equipment of units nos 3 and 4 in terms of their conversion into biomass-only combustion, commissioned by ELBIS Rogowiec.